01/08/2011
Former director deneral of Urban Planning for the Generalitat de Catalunya takes the helm of one of the most strategic actions for the country's economic and social development

31/03/2011
This power facility, which has required an investment of €32.6 millions, is the main source of electricity, heating and cooling for the Alba synchrotron and is pioneering in Europe in terms of eco-efficiency.

28/03/2011
Over the coming months, this new public space will become an elevated area for public leisure use with views of the Collserola and the Alba synchrotron, trees, benches, a fountain and a kiosk.

21/03/2011
Parc de l’Alba has been chosen as one of the locations for this year’s Europan European Architecture and Urban-Planning contest.

11/03/2011
The first stage, which deals with more than 12 hectares of green zones, will reinforce biologic connectivity between Parc de Collserola and the natural spaces in the green corridor.

13/12/2010
The first stage of development at Parc de l’Alba culminated with the opening of Science Avenue, which has brought about the creation of exemplary infrastructures and urban spaces.

Pag: 1/7 Next >